Search Result(s) for Wall

Bid Title Country
Summary
Bid Date
Development of Crash Modification Factors Flag of USA
USA
...prime, rate, as published daily in the Wall Street Journal, plus 1.75 percent. For further
Posted Date: May 24, 2012
Pinto Dam Headworks Modification, Columbia Basin Project, Washington Flag of USA
USA
...tall by 4.98' wide L-shaped top seal walls within the existing headworks structure, and seeding
Posted Date: May 24, 2012      Bid Date: Jun 26, 2012
TENTS For FOB Miami Flag of USA
USA
...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample ...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample
Posted Date: May 24, 2012      Bid Date: May 25, 2012
Construct Field Maintenance Shop Flag of USA
USA
...pre-finished metal panel, and glazed curtain wall components. The majority of the roof at
Posted Date: May 24, 2012      Bid Date: Jun 05, 2012
TENTS For FOB Santa Fe, Sorhk Kotal Mazrea OCC, & Field ASP Flag of USA
USA
...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample ...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample
Posted Date: May 24, 2012      Bid Date: May 24, 2012
TENTS For FOB Seattle and Jahel Dar Lab-e OCC Flag of USA
USA
...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample ...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample
Posted Date: May 24, 2012      Bid Date: May 25, 2012
EXTENDER, CABLES, ADAPTER, MOUNT, LECTURN, COMPUTER and etc Flag of USA
USA
...CEILING PLATE COVERS, 1-EA MOUNT HEAD, 1-EA WALL PLATE, 2-EA MONITOR ARMS, 1-EA HARDWARE KIT, 3-...RQMNTS: 120-VAC, 60-HZ. CLIN 0006 WALL PLATE Part Number: WPL-1213 (qty 2 each)
Posted Date: May 24, 2012      Bid Date: Jun 22, 2012
Card Reader Installation (construction) Flag of USA
USA
...electrical and shall repair doors, door frames, walls and ceilings where impacted by this project.
Posted Date: May 24, 2012      Bid Date: Jun 25, 2012
TENTS For FOB New York and ShaRQ Darwaza Jame OCC Flag of USA
USA
...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample ...with required equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample
Posted Date: May 24, 2012      Bid Date: May 25, 2012
Renovate 920 ASTS Admin Facility, Bldg. 1368 Flag of USA
USA
...requirement consists of interior work on floors, walls and ceilings; exterior construction of a sidewalk, equipment
Posted Date: May 24, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business