Home : Alphabetical List : W & D Nozzle : Wall Calendar

Search Result(s) for Wall Calendar

Bid Title Country
Summary
Bid Date
Renovate 920 ASTS Admin Facility, Bldg. 1368 Flag of USA
USA
...will be 210 calendar days after receiving ...work on floors, walls and ceilings; exterior
Posted Date: May 24, 2012
US DOJ EOIR Renovation of 10th Floor Flag of USA
USA
...duration of 180 calendar days. Selective demolition ...removal of existing walls, doors, frames, ceilings ...interior floor and wall finishes, mechanical, security
Posted Date: May 24, 2012      Bid Date: May 31, 2012
TENTS FOB Marjan Flag of USA
USA
...Astroturf flooring, doors, walls, and generators to ...good for 30 calendar days after close
Posted Date: May 24, 2012      Bid Date: May 25, 2012
Repair Enlisted Dorm Building 145 Flag of Canada
Canada
...for Construction: 330 Calendar Days Job Descriptions: ...replacement of interior walls, ceilings, bathroom plumbing ...tiles, carpets, ceramic wall tiles, finishes, interior
Posted Date: May 24, 2012      Bid Date: Jun 04, 2012
Paint and Repair Buildings Bldg 6, 8, 21, 28 ,34, & 46 Phase 3 Project Number: 531-09-104 Flag of USA
USA
...work is 150 calendar days (~5 months) after ...mechanical, electrical, utilities, wall and floor finishes,
Posted Date: May 24, 2012      Bid Date: May 30, 2012
Stabilize Building 10 Housing Unit Flag of USA
USA
...non-load bearing wall. The performance period ...period is 180 calendar days after receipt
Posted Date: May 24, 2012      Bid Date: Jun 28, 2012
TENTS FOB Warrior (RUBA 2) Flag of USA
USA
...Astroturf flooring, doors, walls, and generators to ...good for 30 calendar days after close
Posted Date: May 24, 2012      Bid Date: May 25, 2012
Project No. 526-09-126; Replace Perimeter Walkways Flag of USA
USA
...CONCRETE SIDEWALKS, RETAINING WALLS, CURB RAMPS, RE-...EXISTING STONE RETAINING WALL, CONSTRUCTION OF NEW ...time is 120 calendar days from NTP,
Posted Date: May 24, 2012      Bid Date: Jun 17, 2012
OMAHA DISTRICT - Replace Gate Hoist Controllers, Dampers in Louvers, and Drain Pipe Extensions & Repairing Concrete at Fort Randall Dam, South Dakota Flag of USA
USA
...intake structure curtain wall bearing support locations ...beams" and "curtain walls" between towers. The ...the work 180 calendar days after receipt
Posted Date: May 24, 2012      Bid Date: Jun 25, 2012
VTC system Flag of USA
USA
...microphone, remote, software. Wall Shelf for Camera ...good for 30 calendar days after close
Posted Date: May 23, 2012      Bid Date: Jun 18, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business