Home : Alphabetical List : W & D Nozzle : Wall Cabinet Material

Search Result(s) for Wall Cabinet Material

Bid Title Country
Summary
Bid Date
Independent Living Construction Project Flag of USA
USA
...Contractor shall furnish all labor, materials, supplies, equipment and qualified personnel ...ITEM #1: Kitchen Install owner-provided wall oven and cooktop to include ...work. Also remove existing sink cabinet and provide new
Posted Date: May 22, 2012      Bid Date: Jun 01, 2012
PAINTING/FLOOR REFINISHING - U.S. COAST GUARD AIR STATION CAPE COD, BOURNE, MA Flag of USA
USA
...provide all personnel, equipment, tools, materials, supervision, and other items and ...of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, cabinets, trim, molding, and other areas)
Posted Date: May 21, 2012      Bid Date: Jun 12, 2012
Full Vision Display Cabinets & Wall Cases Flag of USA
USA
...providing eight (8) Full Vision Display Cabinets and three (3) Upright Display Wall Cases. Contractors responding should specify ...Wall Cases are as follows: Cabinet Requirements: Eight (8) Total ...finish Cabinets constructed with new materials
Posted Date: May 18, 2012      Bid Date: May 25, 2012
PROJ. 626-11-101 Flag of USA
USA
...GENERAL CONSTRUCTION: Provide all labor, material, equipment, and supervision necessary to ...of existing 3rd floor interior walls, doors and other architectural items, ...Delete 3rd floor Elevator Lobby wall panels. Substitute with
Posted Date: May 18, 2012      Bid Date: Jun 08, 2012
KITCHEN CABINETS Flag of USA
USA
...Number: BERGLUND-F3G3MN2074A001-CDCIII-KITCHEN-CABINETS Notice Type: Combined Synopsis/Solicitation ...and lower kitchen cabinets and wall cabinets in training room. The specifications ...has 4" backsplash, progressive solid surface material like HI-
Posted Date: May 16, 2012      Bid Date: May 18, 2012
KITCHEN CABINETS Flag of USA
USA
...Number: BERGLUND-F3G3MN2074A001-CDCIII-KITCHEN-CABINETS Notice Type: Combined Synopsis/Solicitation ...and lower kitchen cabinets and wall cabinets in training room. The specifications ...has 4" backsplash, progressive solid surface material like HI-
Posted Date: May 14, 2012      Bid Date: May 18, 2012
KITCHEN CABINETS Flag of USA
USA
...Number: BERGLUND-F3G3MN2074A001-CDCIII-KITCHEN-CABINETS Notice Type: Combined Synopsis/Solicitation ...and lower kitchen cabinets and wall cabinets in training room. The specifications ...has 4" backsplash, progressive solid surface material like HI-
Posted Date: May 12, 2012      Bid Date: May 18, 2012
PROJ. 626-11-101 Flag of USA
USA
...GENERAL CONSTRUCTION: Provide all labor, material, equipment, and supervision necessary to ...of existing 3rd floor interior walls, doors and other architectural items, ...Delete 3rd floor Elevator Lobby wall panels. Substitute with
Posted Date: May 10, 2012      Bid Date: Jun 08, 2012
Hazardous Material Storage Building Flag of USA
USA
...NAWCAD) has a requirement for a Hazardous Material Storage Building. Method of Payment: ...for the storage of flammable materials where the storage building is ...Drum Capacity: minimum 8 Internal Separation Walls: 1 each of 4-hour
Posted Date: May 10, 2012      Bid Date: Jun 04, 2012
PROJ. 626-11-101 Flag of USA
USA
...GENERAL CONSTRUCTION: Provide all labor, material, equipment, and supervision necessary to ...of existing 3rd floor interior walls, doors and other architectural items, ...Delete 3rd floor Elevator Lobby wall panels. Substitute with
Posted Date: May 09, 2012      Bid Date: Jun 04, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business