Home : Alphabetical List : W & D Nozzle : Wall And Floor Ceramic Tiles

Search Result(s) for Wall And Floor Ceramic Tiles

Bid Title Country
Summary
Bid Date
Repair Enlisted Dorm Building 145 Flag of Canada
Canada
...fabrication, and replacement of interior walls, ceilings, bathroom plumbing fixtures, toilet ...bathroom plumbing fixtures, toilet accessories, floor tiles, carpets, ceramic wall tiles, finishes, interior and exterior doors,
Posted Date: May 24, 2012      Bid Date: Jun 04, 2012
Remodel the bathroom of veterans home to include the handicap access to bathroom and Shower/tub Flag of USA
USA
...jamb, install hardback board and ceramic tiles over existing subfloor, repair ceiling, ...subfloor, repair ceiling, move any walls to accommodate new fixtures and ...concept at least 36 wide. Tile all ...Tile all walls, ceiling, and floor.
Posted Date: May 22, 2012      Bid Date: Jun 06, 2012
Renovate Pot Washing Room in Kitchen Flag of USA
USA
...pot washing room (CB-79), a wall on the outside of room ...of the drywall on the walls, remove drop ceiling, remove the ...remove drop ceiling, remove the floor, replace the lighting,
Posted Date: May 10, 2012      Bid Date: May 22, 2012
Repair Enlisted Dorm Building 145 Flag of Canada
Canada
...fabrication, and replacement of interior walls, ceilings, bathroom plumbing fixtures, toilet ...bathroom plumbing fixtures, toilet accessories, floor tiles, carpets, ceramic wall tiles, finishes, interior and exterior doors,
Posted Date: May 09, 2012      Bid Date: Jun 04, 2012
Repair Enlisted Dorm Building 145 Flag of Canada
Canada
...fabrication, and replacement of interior walls, ceilings, bathroom plumbing fixtures, toilet ...bathroom plumbing fixtures, toilet accessories, floor tiles, carpets, ceramic wall tiles, finishes, interior and exterior doors,
Posted Date: May 02, 2012      Bid Date: Jun 04, 2012
Renovate Pot Washing Room in Kitchen Flag of USA
USA
...pot washing room (CB-79), a wall on the outside of room ...of the drywall on the walls, remove drop ceiling, remove the ...remove drop ceiling, remove the floor, replace the lighting,
Posted Date: Apr 25, 2012      Bid Date: May 22, 2012
Bldg 92 Bathrooms Flag of USA
USA
...limited to, restoration of existing ceramic floor tile, glazed block walls, removing and replacing existing lavoratories,
Posted Date: Apr 19, 2012      Bid Date: Apr 30, 2012
CLC (Community Living Center) Cultural Transformation Building 500 Renovation 5th Floor A Wing Flag of USA
USA
...Transformation Building 500 Renovation 5th Floor " A " Wing at the Department of ...interior demolition, asbestos abatement, insulation, ceramic tile, drywall, metal stud walls, custom sliding doors, specialty hardware,
Posted Date: Apr 09, 2012      Bid Date: Jun 13, 2012
Bldg 92 Bathrooms Flag of USA
USA
...limited to, restoration of existing ceramic floor tile, glazed block walls, removing and replacing existing lavoratories,
Posted Date: Apr 05, 2012      Bid Date: May 24, 2012
Renovate Pot Washing Room in Kitchen Flag of USA
USA
...pot washing room (CB-79), a wall on the outside of room ...of the drywall on the walls, remove drop ceiling, remove the ...remove drop ceiling, remove the floor, replace the lighting,
Posted Date: Apr 05, 2012      Bid Date: Apr 26, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business