Home : Alphabetical List : W & D Nozzle : W Beams (Option: Circular Post or Other Posts)

Search Result(s) for W Beams (Option: Circular Post or Other Posts)

Bid Title Country
Summary
Bid Date
Corrosion Control Painting of Storage Tanks Flag of USA
USA
...Prep and paint existing metal beams, and Remove and replace caulking ...effect through the Federal Acquisition Circular (FAC) 2005-59, Defense Federal ...644(r)). FAR 52.219-28, Post Award Small Business
Posted Date: May 24, 2012      Bid Date: May 31, 2012
Corrosion Control Painting of Storage Tanks Flag of USA
USA
...Prep and paint existing metal beams, and Remove and replace caulking ...effect through the Federal Acquisition Circular (FAC) 2005-59, Defense Federal ...644(r)). FAR 52.219-28, Post Award Small Business
Posted Date: May 23, 2012      Bid Date: May 24, 2012
Announcement Update Flag of USA
USA
...to concrete work, tiles, support beams, ceiling tiles, electrical (wiring and ...solicitation. The Government proposes to post the RFP to a file transfer
Posted Date: May 23, 2012      Bid Date: Jun 14, 2012
Upgrade to Existing IBA (Scanditronix) RFA-300 Scanning Water Phantom Flag of USA
USA
...IBA Dosimetry America, 3150 Stage Post Drive, Suite 110, Bartlett, TN ...from a complex set of actual beam measurements and convolves them with
Posted Date: May 22, 2012      Bid Date: Jun 05, 2012
Corrosion Control Painting of Storage Tanks Flag of USA
USA
...Prep and paint existing metal beams, and Remove and replace caulking ...effect through the Federal Acquisition Circular (FAC) 2005-59, Defense Federal ...644(r)). FAR 52.219-28, Post Award Small Business
Posted Date: May 21, 2012      Bid Date: May 24, 2012
Pawnee Buttes Trailhead Project Flag of USA
USA
...Line = 30 inches depth 1. Metal posts, beams, rafters and roof 2. Gable roof ...ground to bottom of tension beam to be approximately 8'. 7. Rafters/...of a chord beam running from post top to
Posted Date: May 18, 2012      Bid Date: Jun 29, 2012
Picnic Shelters - Supply Flag of USA
USA
...Line = 30 inches depth 1. Metal posts, beams, rafters and roof 2. Gable roof ...ground to bottom of tension beam to be approximately 8'. 7. Rafters/...of a chord beam running from post top to
Posted Date: May 18, 2012      Bid Date: Jun 08, 2012
24' Electronic Drop Arm Gate Flag of USA
USA
...in effect through Federal Acquisition Circular FAC 2005-58. The associated ...ELECTRONIC DROP ARM GATE CRASH BEAM PROVIDES MASSIVE STOPPING CAPABILITY, WHILE ...Subcontract Awards. 52.219-28 Post-Award Small Business
Posted Date: May 17, 2012      Bid Date: May 18, 2012
Corrosion Control Painting of Storage Tanks Flag of USA
USA
...Prep and paint existing metal beams, and Remove and replace caulking ...effect through the Federal Acquisition Circular (FAC) 2005-59, Defense Federal ...644(r)). FAR 52.219-28, Post Award Small Business
Posted Date: May 17, 2012      Bid Date: May 24, 2012
Corrosion Control Painting of Storage Tanks Flag of USA
USA
...Prep and paint existing metal beams, and Remove and replace caulking ...effect through the Federal Acquisition Circular (FAC) 2005-59, Defense Federal ...644(r)). FAR 52.219-28, Post Award Small Business
Posted Date: May 16, 2012      Bid Date: May 24, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business