Home : Alphabetical List : U - Box Medium : Ultrasonic Assembly Equipment

Search Result(s) for Ultrasonic Assembly Equipment

Bid Title Country
Summary
Bid Date
D8 GULF COAST DUAL CUTTER DRYDOCK Flag of USA
USA
...provide all necessary facilities, materials, equipment, and personnel to DRYDOCK and ...work items: CGC AMBERJACK PERFORM ULTRASONIC THICKNESS MEASUREMENTS (D) PERFORM ...Clean, Inspect, and Repair (D) RUDDER ASSEMBLIES, REMOVE, INSPECT, AND REINSTALL (D) Rudder
Posted Date: May 09, 2012      Bid Date: May 17, 2012
Site Wide Sprinkler Systems Repair Flag of USA
USA
...provide all labor, transportation, materials, equipment, supplies and supervision to perform ...or replacement of drum drip assemblies. b. Repair or replacement of sprinkler ...in older piping systems. iii.Ultrasonic testing of piping
Posted Date: Apr 24, 2012
CGC WAHOO DRYDOCK REPAIRS FY12 Flag of USA
USA
...provide all labor, material and equipment necessary for dry dock repairs ...limited to: WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform ...22: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
Posted Date: Apr 20, 2012      Bid Date: May 09, 2012
CGC WAHOO DRYDOCK REPAIRS FY12 Flag of USA
USA
...provide all labor, material and equipment necessary for dry dock repairs ...limited to: WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform ...22: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
Posted Date: Apr 18, 2012      Bid Date: May 09, 2012
SOURCES SOUGHT NOTICE: DRY DOCK REPAIRS USCGC SEA FOX Flag of USA
USA
...provide all necessary facilities, materials, equipment, and personnel to DRYDOCK repairs ...WORK ITEMS: WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform ...25: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
Posted Date: Apr 11, 2012      Bid Date: Apr 18, 2012
CGC WAHOO DRYDOCK REPAIRS FY12 Flag of USA
USA
...provide all labor, material and equipment necessary for dry dock repairs ...limited to: WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform ...22: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
Posted Date: Apr 06, 2012
USCGC BAINBRIDGE ISLAND (WPB-1343) DRYDCOK REPAIRS Flag of USA
USA
...Provide all labor, material and equipment necessary to perform dry-dock ...and Reinstall; Mechanical Shaft Seal Assemblies, Overhaul; Propulsion Shaft Bearings (External) , ...Exchangers , Clean and Inspect; Rudder Assembly, Remove, Inspect and
Posted Date: Mar 29, 2012      Bid Date: Apr 02, 2012
USCGC WAHOO (WPB-87345) DRYDOCK REPAIRS Flag of USA
USA
...provide all necessary facilities, materials, equipment, and personnel to DRYDOCK repairs ...WORK ITEMS: WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform ...22: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
Posted Date: Mar 26, 2012      Bid Date: Mar 30, 2012
Awarding a PO for the repair and/or calibration of the following equipment: Probe/Transmitter Assembly for DTS-1, PN: DTT1, ASN: S100-2MT4-3A1A1 and Sensor, Ice Free Wind (IFW) ASOS Model 425NWS, (WS425D7A1C), ASN: S100-2A8MT3A2 to Vaisala, Inc. Flag of USA
USA
...or calibration of the following equipment: 16 each Probe/Transmitter Assembly for DTS-1, PN: DTT1, ASN: ...ice free, wind sensors'; repair, ultrasonic, wind sensors'; and
Posted Date: Mar 26, 2012      Bid Date: Mar 30, 2012
DRYDOCK CGC STEELHEAD Flag of USA
USA
...provide all necessary facilities, materials, equipment, and personnel to DRYDOCK repairs ...the following WORK ITEMS: 1. Perform Ultrasonic Thickness Measurements 2. Perform ...23. Speed Log, Skin Valve Assembly, Clean and Inspect 24. Sea
Posted Date: Mar 19, 2012      Bid Date: Mar 28, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business