Home : Alphabetical List : R & O Membrane Filter : R Fuel Control Tube

Search Result(s) for R Fuel Control Tube

Bid Title Country
Summary
Bid Date
Lawn Maintenance Equipment Flag of USA
USA
...inch rear pneumatic tires; 3 gallon fuel tank. Minimum 4 inch gage mower ...and bed knife blade. Welded tube frame assembly. Adjustable cutting height ...Complete with tube mounted throttle control. Minimum 25CC engine.
Posted Date: May 14, 2012      Bid Date: May 17, 2012
Lawn Maintenance Equipment Flag of USA
USA
...inch rear pneumatic tires; 3 gallon fuel tank. Minimum 4 inch gage mower ...and bed knife blade. Welded tube frame assembly. Adjustable cutting height ...Complete with tube mounted throttle control. Minimum 25CC engine.
Posted Date: May 09, 2012      Bid Date: May 15, 2012
Drydock Repairs to the USCGC FARALLON (WPB-1301), USCGC HAWK (WPB-87355) and USCGC KEY LARGO (WPB-1324). Flag of USA
USA
...Test; Appendages (U/W) - Internal, Preserve; Tanks (Fuel Service), Clean and Inspect; Voids (...External), Renew; Propulsion Shaft , Stern Tube Forward Bearing , Renew; Propellers: Remove, ...Aft Bearing Carrier, Renew; Stern Tubes, Interior Surfaces, Preserve
Posted Date: May 02, 2012      Bid Date: May 09, 2012
BURNER CONTROL SYSTEM REPLACEMENT Flag of USA
USA
...NOTICE: The Centers for Disease Control and Prevention, National Institute for ...Cleaver Brooks CB700-350 fire tube boilers located at the Morgantown, ...PSI - Operating Pressure: 50 PSI - Fuel 1: Natural Gas - Number
Posted Date: Apr 13, 2012      Bid Date: Apr 24, 2012
SOURCES SOUGHT NOTICE: DRY DOCK REPAIRS USCGC SEA FOX Flag of USA
USA
...Inspect (D) WORK ITEM 5: Tanks (MP Fuel Service), Clean and Inspect (D) WORK ...Renew (O) WORK ITEM 19: Stern Tubes, Interior Surfaces, Preserve 100% (O) WORK ...owns 51 % of the business, controls the management and
Posted Date: Apr 11, 2012      Bid Date: Apr 18, 2012
BURNER CONTROL SYSTEM REPLACEMENT Flag of USA
USA
...NOTICE: The Centers for Disease Control and Prevention, National Institute for ...Cleaver Brooks CB700-350 fire tube boilers located at the Morgantown, ...PSI - Operating Pressure: 50 PSI - Fuel 1: Natural Gas - Number
Posted Date: Apr 09, 2012      Bid Date: Apr 24, 2012
USCGC WAHOO (WPB-87345) DRYDOCK REPAIRS Flag of USA
USA
...Inspect (D) WORK ITEM 6: Tanks (MP Fuel Service), Clean and Inspect (D) WORK ...Renew (O) WORK ITEM 17: Stern Tubes, Interior Surfaces, Preserve 100% (O) WORK ...owns 51 % of the business, controls the management and
Posted Date: Mar 26, 2012      Bid Date: Mar 30, 2012
DRYDOCK CGC STEELHEAD Flag of USA
USA
...Clean and Inspect 7. Tanks (MP Fuel Service), Clean and Inspect 8. Pilothouse ...Bearing Carrier, Renew 18. Stern Tube, Interior Surfaces, Preserve 100% 19. ...owns 51 % of the business, controls the management and
Posted Date: Mar 19, 2012      Bid Date: Mar 28, 2012
Flange Kit Flag of USA
USA
...70389 4. Nomenclature/Noun - Kit, MEC TUBE 5. NSN - 2840-K0-219-229A ...100. Tube, Steel, to provide fuel to the ...by the agency. 12. Export Control - No 13. Buyer name: Andrew
Posted Date: Mar 14, 2012      Bid Date: Mar 14, 2012
Boiler maintenance Flag of USA
USA
...DIVISION 1. Three (3) each Superior fire tube boiler Model 4-2506 with Industrial ...technician shall test and adjust fuel/air ratio to optimum and ...and boiler and boiler master controls; and provide written
Posted Date: Mar 05, 2012      Bid Date: Mar 19, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business