Middle Ridge Road Surfacing and Reconditioning Flag of USA
USA
...be disposed of in the quarry located at milepost 0.2 on NFSR ...on NFSR 6250. (6) Developing existing quarries for shot rock production and ...included as Option 3. (9) Mobilization of Equipment to perform the
Posted Date: May 23, 2012      Bid Date: Jun 28, 2012
Bloody Point and Fish Creek Payco Rock Crushing Flag of Canada
Canada
...rap (includes development of rock quarries). This includes furnishing labor, equipment, supervision, transportation and operating supplies, ...and operating supplies, required to complete the project. The project areas
Posted Date: May 22, 2012
Middle Ridge Road Surfacing and Reconditioning Flag of USA
USA
...be disposed of in the quarry located at milepost 0.2 on NFSR ...on NFSR 6250. (6) Developing existing quarries for shot rock production and ...included as Option 3. (9) Mobilization of Equipment to perform the
Posted Date: May 11, 2012      Bid Date: Jun 28, 2012
Bloody Point and Fish Creek Payco Rock Crushing Flag of Canada
Canada
...rap (includes development of rock quarries). This includes furnishing labor, equipment, supervision, transportation and operating supplies, ...and operating supplies, required to complete the project. The project areas
Posted Date: Apr 27, 2012
UK-Newtownards: transport equipment and auxiliary products to transportation Flag of United Kingdom
United Kingdom
...IV. VI. UK-Newtownards: transport equipment and auxiliary products to transportation ...of performance: Council Depot, 149 Quarry Heights, North Road, Newtownards BT23 ...tonnes GVW refuse collection vehicles complete automatic bin lift
Posted Date: Apr 26, 2012      Bid Date: Jun 19, 2012
Construction of Missouri River Bank Stabilization Flag of USA
USA
...Repairs consists of placing new quarry-run stone on listed structures ...furnish all labor, material, tools, equipment and qualified supervision necessary to ...EST). Potential vendors must also complete their online representations
Posted Date: Apr 05, 2012      Bid Date: Apr 11, 2012
Bloody Point and Fish Creek Payco Rock Crushing Flag of Canada
Canada
...rap (includes development of rock quarries). This includes furnishing labor, equipment, supervision, transportation and operating supplies, ...and operating supplies, required to complete the project. The project areas
Posted Date: Apr 04, 2012
Synopsis for Emergency Repair of Flood Control Works, for repair of Clyde Kansas Levee, located in Kansas and within the County of Cloud. Flag of USA
USA
...provide all labor, materials, and equipment to repair damage from heavy ...This project will include placing quarry-fill run rock on the ...REQUIREMENTS: Bidders are required to complete ORCA requirements prior
Posted Date: Jan 23, 2012      Bid Date: Apr 05, 2012
Custom ornamental metal fabrication for the Nashville Cemetery, South Madison, Tennessee and the Raleigh National Cemetery, Raleigh, North Carolina. Flag of USA
USA
...proposals for all labor, materials, equipment and travel necessary to complete custom ornamental metal fabrication for ...National Cemetery located at 501 Quarry Rock Road, Raleigh, North Carolina.
Posted Date: Nov 07, 2011
Rip Rap for LSAF Flag of USA
USA
...all incidental work required to complete the contract work. 1.4.1 Riprap Measurement ...furnishing all labor, materials and equipment for delivery of riprap material ...of processing riprap at the quarry that will preclude
Posted Date: Nov 02, 2011      Bid Date: Nov 04, 2011

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business