Search Result(s) for Key Cylinders

Bid Title Country
Summary
Bid Date
Interlock Control System Replacement at Pike Island, New Cumberland and Hannibal Locks and Dam, Ohio River Flag of USA
USA
...enclosure shall contain key operated bypass switches ...to Miter Gate Cylinders The mechanical work ...every miter gate cylinder at three projects (
Posted Date: May 23, 2012      Bid Date: Jul 17, 2012
REVISED- Tier I Protective Under Garments (PUG) Flag of USA
USA
...2gr Right circular Cylinder (RCC) projectiles and ...the twelve (12) key performance attributes (KPA)
Posted Date: May 23, 2012      Bid Date: Jun 12, 2012
Helium-3 Proportional Counters Flag of USA
USA
...at NCNR. The key material in these ...Chemical: 99.999% Cylinder: Smallest size possible
Posted Date: May 22, 2012      Bid Date: Jun 07, 2012
CONTRACTOR SHALL PROVIDE VARIOUS HVAC, PLUMBING, GENERAL CONSTRUCTION SERVICES AT THE FLOWER GARDEN BANKS NATIONAL MARINE SANCTUARY (FGBNMS) LOCATED IN GALVESTON, TX Flag of USA
USA
...keyed to existing key system (contractor to ...contractor to provide cylinders), remove lock rod
Posted Date: May 18, 2012      Bid Date: May 21, 2012
Webster Dam - Outlet Works Metalworks Recoating Flag of USA
USA
...cover, hydraulic hoist, cylinder head, semi-automatic ...Safety, (2) Company Experience, (3) Key Personnel and (4) Past
Posted Date: May 16, 2012
REVISED- Tier I Protective Under Garments (PUG) Flag of USA
USA
...2gr Right circular Cylinder (RCC) projectiles and ...the twelve (12) key performance attributes (KPA)
Posted Date: May 15, 2012      Bid Date: May 31, 2012
Provide two (2) new marine propulsion engines and components in accordance with the attached solicitation. The two engines will be mated to existing Twin Disc MG-514 gears. Flag of USA
USA
...engine with replaceable cylinder liners, complete with ...control panels, with key switch, start and
Posted Date: May 10, 2012      Bid Date: May 22, 2012
Kickapoo Nation School Library-Furniture and Equipment Flag of USA
USA
...management trough with key locking entry door, ...seat, adjustable gas cylinder for 16-20.5
Posted Date: May 08, 2012      Bid Date: May 10, 2012
REVISED- Tier I Protective Under Garments (PUG) Flag of USA
USA
...2gr Right circular Cylinder (RCC) projectiles and ...the twelve (12) key performance attributes (KPA)
Posted Date: May 01, 2012      Bid Date: May 11, 2012
Adiana Perminent Contraception and Novasure Flag of USA
USA
...CLIN 0002 CO2 Cylinders (5 Pack), Part# 815012 ...the prospective contractors key management personnel to
Posted Date: Apr 25, 2012      Bid Date: May 10, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business