Home : Alphabetical List : F & I Convertor : FAA Certified Contract Manufacturing

Search Result(s) for FAA Certified Contract Manufacturing

Bid Title Country
Summary
Bid Date
Market Survey Sources Sought to Provide aPratt & Whitney Canada (PWC) PT6A-135A Maintenance/Overhaul Program Flag of USA
USA
...Information: The Federal Aviation Administration (FAA), Flight Inspection Services (FIS) is ...please proceed to the FAA's Contract Opportunities Website at faaco....Aircraft Engine and Engine Parts Manufacturing" with a size standard of
Posted Date: May 11, 2012      Bid Date: May 25, 2012
MARKET SURVEY: Program Management, Hardware Support and/or Repairs of CBP Generators Flag of USA
USA
...IS BEST VIEWED ON THE FAA CONTRACT OPPORTUNITIES WEB SITE: HTTPS://FAACO....veteran-owned small businesses and 8(a) certified firms; capable of providing the ...is 335312, Motor and Generator Manufacturing with a size
Posted Date: May 01, 2012      Bid Date: May 16, 2012
MARKET SURVEY/REQUEST FOR INFORMATION: Liquid Chromatograph/Mass Spectrometers Flag of USA
USA
...PURPOSE:The Federal Aviation Administration (FAA), Civil Aerospace Medical Institute (CAMI), ...services/equipment provided by previous contracts. Please provide information regarding your ...economically disadvantaged businesses that are certified by the SBA
Posted Date: Apr 25, 2012      Bid Date: May 09, 2012
Rapid Development Integration Facility (RDIF) Flag of USA
USA
...Mechanics e. Airframe/power plant (AP) certified technicians 2. Short term specialties a. Trade ...Design of experiments c. Intellectual delivery 3. Manufacturing capabilities a. CAD/CAM drawing b. Stress ...Quality assurance/In-process inspection/FAA certification 9. Engineering and
Posted Date: Apr 03, 2012      Bid Date: Apr 30, 2012
MARKET SURVEY CAPABILITY ASSESSMENT FOR THE ACQUISITION OF DOPPLER VOR SIDE BAND 2 ft. HIGH PLASTIC DOME ANTENNA SHELTERS, NSN 5985-00-198-4906. 1ST ARTICLE REQUIRED. DTFAAC-12-R-03678 Flag of USA
USA
...4906 MANUFACTURED IN ACCORDANCE WITH FAA SPECIFICATION FAAD-F-1365B AND DRAWING ...economically disadvantaged businesses that are certified by the SBA for participation ...326199: All Other Plastics Product Manufacturing, with a size standard
Posted Date: Apr 03, 2012      Bid Date: Apr 17, 2012
Rapid Development Integration Facility (RDIF) Flag of USA
USA
...Mechanics e. Airframe/power plant (AP) certified technicians 2. Short term specialties a. Trade ...Design of experiments c. Intellectual delivery 3. Manufacturing capabilities a. CAD/CAM drawing b. Stress ...Quality assurance/In-process inspection/FAA certification 9. Engineering and
Posted Date: Apr 02, 2012      Bid Date: Apr 30, 2012
High Frequency (VHF) and Ultra-High Frequency (UHF) Antennas Flag of USA
USA
...proposal of any kind. The FAA is not seeking or accepting ...the Government to enter into a contract. The ...economically disadvantaged businesses that are certified by the SBA for participation ...the technical ability to perform manufacturing
Posted Date: Mar 31, 2012      Bid Date: Apr 30, 2012
MARKET SURVEY/REQUEST FOR INFORMATION: Distance Measuring Equipment (DME) for two FAA C-90 Aircraft Flag of USA
USA
...PURPOSE:The Federal Aviation Administration (FAA), Technical Operations, Flight Inspection Services (...services/equipment provided by previous contracts. Please provide a completed Business Declaration. ...economically disadvantaged businesses that are certified by the SBA
Posted Date: Mar 23, 2012      Bid Date: Apr 23, 2012
MARKET SURVEY / SOURCES SOUGHT FOR REPAIR OF P/N 2243500-36 "Flight Data ACQ Unit" Flag of USA
USA
...for the Federal Aviation Administration (FAA), Mike Monroney Aeronautical Center (MMAC), ...veteran-owned small businesses and 8(a) certified firms, capable of fulfilling this ...and Nautical System and Instrument Manufacturing with a size standard
Posted Date: Mar 21, 2012      Bid Date: Mar 26, 2012
AMCOM Logistics Support Facility Management Activity (LSFMA) Flag of USA
USA
...ISO 9001, ISO 14001, and FAA 145) be met collectively by a ...platforms covered by the LSFMA contract. 3. Question: With regards to Page ...substantiation as a substitution for being certified? Answer: No. AS
Posted Date: Feb 01, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business