Home : Alphabetical List : C 01 : C Air Pressure Tube

Search Result(s) for C Air Pressure Tube

Bid Title Country
Summary
Bid Date
Renovate Vandenberg Hall Phase 9 Flag of USA
USA
...purposes only. The United States Air Force Academy, CO seeks potential ...New monolithic pavers New fin tube isolation valves New piping from ...isolation valves New piping from pressure relief valves to
Posted Date: May 18, 2012      Bid Date: Jun 04, 2012
LOSS-IN-WEIGHT FEEDER Flag of USA
USA
...will be connected via flex-tube or expansion joint to an ...the feeder may see back pressure from the reactor. The entire ...pressure precluding the possibility of air entering the feed
Posted Date: May 04, 2012      Bid Date: May 21, 2012
Warehousing and Logistics Services Flag of USA
USA
...PVS-23 NVDs with Pinnacle Tube NVD Image Intensifier Tubes Small Arms and Accessories to ...Turbine, Non Aircraft Drive Unit, Air Turbine AN/APG-68 Modular ...Beacon (F-16) Radar Transmitter (F-16) Pressure
Posted Date: May 04, 2012      Bid Date: May 14, 2012
GATORS Flag of USA
USA
...type Compression ignition Lubrication Full pressure Oil filter Screw on filter ...3700 +/- 25 Cooling system Liquid Air cleaner Dry, replaceable single element ...75 in (44.4 mm) steel tube Passenger grab handles
Posted Date: Apr 26, 2012      Bid Date: May 02, 2012
High Pressure Air and Purification System Flag of USA
USA
...employees. The 184 IW Kansas Air National Guard (KSANG) has a requirement ...following item. CLIN 0001: High pressure air purification system must be able ...valves, check valves, interconnecting SS tube connecting the
Posted Date: Apr 25, 2012      Bid Date: May 07, 2012
Extended Submersible Barrier Screens (ESBS) Roller Chains, Bearings, Take-Up Pieces, and Brushes for McNary Dam Flag of USA
USA
...take-up track pieces, sweep tube brushes and guides, control arm ...plate, sheet, and strip for pressure vessels. ASTM A276 (1998a) Stainless ...degrees Fahrenheit. Four hours to air cool. 4.9 Sheave pin
Posted Date: Apr 24, 2012      Bid Date: May 01, 2012
Technical Recovery System (Gaurdian Angel) Flag of USA
USA
...reciprocating saw and spare blades, air pump, three ...absorbent material (either a case or a tube) - all contained in a tactical confined ...quick cut off saw, low pressure lift bag system, 22" emergency
Posted Date: Apr 20, 2012      Bid Date: May 02, 2012
High Pressure Air and Purification System Flag of USA
USA
...employees. The 184 IW Kansas Air National Guard (KSANG) has a requirement ...following item. CLIN 0001: High pressure air purification system must be able ...valves, check valves, interconnecting SS tube connecting the
Posted Date: Apr 19, 2012      Bid Date: May 07, 2012
Computerized Panel Saw Flag of USA
USA
...cross cutting of narrow strips, tube and rod. Material Hold-Down: ...Hold-Down: Full-length pneumatic pressure beam utilizing a split beam design. ...two moveable tables all with air floatation and phenolic
Posted Date: Apr 18, 2012      Bid Date: May 03, 2012
BURNER CONTROL SYSTEM REPLACEMENT Flag of USA
USA
...Cleaver Brooks CB700-350 fire tube boilers located at the Morgantown, ...Steam Boiler - 350 HP - Design Pressure: 150 PSI - Operating ...Level Display Input # 12 2 Combustion Air Interlock: Option 1 - Limit circuit terms.
Posted Date: Apr 13, 2012      Bid Date: Apr 24, 2012

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business