Home : Alphabetical List : B & B Combo : Back Coating Machine

Search Result(s) for Back Coating Machine

Bid Title Country
Summary
Bid Date
Remodeling the Maintenance Building Day Room Flag of USA
USA
...solid surface counter tops with 4" back splash and glass tile between ...be coated with a water resistant coating such as marine varnish to ...outlet installed for the ice machine and electrical service
Posted Date: Apr 20, 2012      Bid Date: Apr 27, 2012
Remodeling the Maintenance Building Day Room Flag of USA
USA
...solid surface counter tops with 4" back splash and glass tile between ...be coated with a water resistant coating such as marine varnish to ...outlet installed for the ice machine and electrical service
Posted Date: Apr 04, 2012      Bid Date: Apr 27, 2012
AIRCRAFT PARTS Flag of USA
USA
...01-498-2289, AIR CYCLE MACHINE, P/N 782630-5, QTY 1 EA: MFGCD: 73030 2. ...EA: MFGCD: 73030 Full Traceability back to OEM (Original Equipment Manufacturer) ...one year but no preservation coating will be applied
Posted Date: Mar 26, 2012      Bid Date: Apr 04, 2012
POLICE AND RELATED GEAR Flag of USA
USA
...tempered steel tape core Nylon coating for extreme temperatures, water, and ...die cut reflective chevrons on back are a first for traffic vests, ...ANSI/ISEA 207-2006 Compliant, Machine wash, 25, EA;
Posted Date: Dec 13, 2011      Bid Date: Dec 13, 2011
POLICE AND RELATED GEAR Flag of USA
USA
...tempered steel tape core Nylon coating for extreme temperatures, water, and ...die cut reflective chevrons on back are a first for traffic vests, ...ANSI/ISEA 207-2006 Compliant, Machine wash, 25, EA;
Posted Date: Dec 08, 2011      Bid Date: Dec 13, 2011
POLICE AND RELATED GEAR Flag of USA
USA
...tempered steel tape core Nylon coating for extreme temperatures, water, and ...die cut reflective chevrons on back are a first for traffic vests, ...ANSI/ISEA 207-2006 Compliant, Machine wash, 25, EA;
Posted Date: Dec 07, 2011      Bid Date: Dec 13, 2011
Repair Pump Motor at the B2.1 No. 3 Pumping Plant, Navajo Indian Irrigation Project, Farmington, New Mexico Flag of USA
USA
...to the contractor's facility and back. FCCO will provide the crane ...it shall be taken to a machine shop. No work with the ...balance motor and touch up coatings. Contractor shall provide a
Posted Date: Aug 11, 2011      Bid Date: Aug 26, 2011
Repair Pump Motor at the B2.1 No. 3 Pumping Plant, Navajo Indian Irrigation Project, Farmington, New Mexico Flag of USA
USA
...to the contractor's facility and back. FCCO will provide the crane ...it shall be taken to a machine shop. No work with the ...balance motor and touch up coatings. Contractor shall provide a
Posted Date: Aug 11, 2011      Bid Date: Aug 26, 2011
Seal Concrete Secondary Containment/Hazardous Waste Facility Flag of USA
USA
...diamond grinder or shot blast machine. In the preparation stage, all ...high solid two-component epoxy coating shall be applied. Product is ...achieved, the USCG will move back into Cell #2 and #3. 4.
Posted Date: Aug 09, 2011      Bid Date: Aug 19, 2011
Replacement of Maintenance Trolley Lines Flag of USA
USA
...to 45 percent, and then back to 10 percent of the ...loading, release assembly from testing machine. Then re-attach and retension ...Method for Weight (Mass) of Coating on Iron and
Posted Date: Aug 01, 2011      Bid Date: Aug 16, 2011

Filter by Posted Date: All May 26 May 25 May 24 May 23 May 22 May 21 May 20 May 19 May 18

Filter by Bid Type:

Filter by Region:

show more

FREE Email Alert

Get Free Bids Email

Customize your email to get bids and tenders that match your business